REPORTS AND STUDIES

Results of preliminary studies

Although the Pozzolan Dalhousie project is still in the conceptual stage, a few preliminary studies have been conducted to assess the project's viability.

Here are the results of these studies, along with related reports.

Laboratoire

July 2025

Sampling to Date & Additional Sampling Plan, Dalhousie Port West Wharf

The purpose of the plan is to provide a high level overview of the sampling to date, and recommendations for additional sediment samples to be collected from the west wharf at the Port of Dalhousie. In combination with the samples already collected, these additional samples will form a data set to be used in the evaluation of the proper management of dredge sediments.

Navire cargo en mer

April 2025

Feasibility study for maneuvers at Dalhousie's west terminal by Panamax and Lakers

The purpose of this study is to determine if Laker and Panamax type vessels can safely transit the approach channel to the western terminal and what maneuvering space they will need for berthing and unberthing maneuvers at this terminal.

AdobeStock_Licenced 873487067.jpeg

November 2024

Environmental Site Assessment Phase I and II, Baseline Assessment

This Phase I and II Environmental Site Assessment aims to identify potential environmental concerns related to the CN Rail line and Dalhousie Port properties, considering the historical and current land use as well as the adjacent properties.

AdobeStock_License 15560837.jpeg

September 2024

Environmental Attributes and Potential Impacts to be Assessed

This report presents the key environmental attributes and potential impacts to be considered as part of the Environmental Impact Assessment.

IMG_3391_edited_edited_edited_edited.jpg

October 2023

Chemical Composition of Pouzzolan - Preliminary Results

The analyses of the collected samples show natural differences in the composition of the pouzzolan. These initial analyses provide us with important information about this natural material.

Création des zones humides

November 2022

Field Studies Update on Wetlands

Maps showing wetland and watercourse field delineations.

Image de NASA

November 2022

Report on the Geology of the quarry

Summary of the observations by Jim Walker, geoscientist at the Department of Natural Ressources and Energy Development of New Brunswick, along with a geological map of the area. 

Wikimedia Commons_Erj1211-1024px-Dalhousienb_2007-06.jpg

October 2022

Information Requirements for the Preliminary Environmental Impact Assessment (EIA)

List of information required to describe the project and develop the Environmental Impact Statement.

unsplash_patrice-bouchard-tT3WcUuEAXI.jpg

October 2022

Preliminary Results of Bird and Active Nest Surveys

The study identified 27 species during the observation period. Among them, 24 were seen on and near the site, and 3 species (the American crow, the common raven, and the bald eagle) were observed flying over the site. No active nests were found on the site during the survey.

Upcoming Studies

The results of upcoming studies will be published on this page as soon as they become available. We encourage you to visit it regularly to stay informed about new publications.

Unpublished Study

The preliminary study on wildlife and flora was conducted by the Atlantic Canada Conservation Data Centre (AC-CDC), and a report was issued on September 12, 2022. The report cannot be made public due to restrictions imposed by its author. A more detailed study on wildlife and flora will be carried out as part of the Environmental Impact Assessment.